       Electrochem, Inc. Fuel Cell Testing Equipment

 TECHNICAL DOCUMENT — Critical Features In Fuel Cell Testing

COMPUTERIZED TEST EQUIPMENT CONFIGURATION CHART

 

 

PS-CompuCell

PS-Dual Range

PS-Reformate

PS-Ultima

System Configuration

       
 

Number of Individual Cells

1

1

1

5

 

Maximum Power (W)

2000

2000

2000

800

 

Number of Internal Humidifiers1

2

2

2

10

 

Automatic Water Removal

 

 
 

Automatic Water Refill1

     

 

Heater Gas Lines1

 
 

Computer, ethernet capable, CD R/W

 

Power Station Software

 

Programmable Duty Cycle

Gas Management

       
 

Low and High Oxidant Flow Rates

 

   
 

Low and High Fuel Flow Rates

 

   
 

Number of Oxidant Gas Flow Controllers

1

2

up to 2

5

 

Number of Fuel Gas Flow Controllers

1

2

up to 4

5

 

Pressure Transducers

 

User Defined Flow Control Range

 

Fuel & Oxidant Purge Lines

 

Methanol supply line

 

TDI Electronic Load Bank

       
 

TDI Electronic Load Bank

 

Dynaload-High Quality, Low Voltage Measurements

 

Accuracy: ± .25% FS for med/high ranges

 

± .50% FS for low range

 

Accuracy: ± 3% FS for all ranges

 

Resolution: .25% of full scale

Measurements

       
 

Cell Temperature, +/- 0.1 C

 

Gas Temperature, +/- 0.1 C

 

Gas Flow, +/- 2% FC

 

Gas Pressure, 60 psig max.

 

Cell Voltage, OCV to 0.05 V

 

Cell Current

Safety

       
 

Low Gas Pressure Shutdown

 

Isolated Purge Gas for Fuel & Oxidant

 

Fuel Enable Interlock Switch Protection

 

Programmable Fault Protection of Fuel Cell

 

Safety Alarm and Push Button Instrument Shutdown

 

Automatic High Temperature Shutdown

1

Available as an option

       

 Fuel Cell Station Design Blocks


©2008 ElectroChem, Inc. - All Rights Reserved